Skip to main content
THE 6-WEEK PROTOCOL

Your MVP in production in 6 weeks.
Fixed price. Signed scope. Delivered, tested, transferred.

A senior developer with 10 years of experience and a proven method. You know exactly what you pay, when you receive it, and in what state.

Book a call

2 slots available Q2 2026 — next availability June

Trusted by

SellsyHenrriCircularPlacePALO IT

The 6-week protocol

From vision to production, week by week.

01

Week 1 · Discovery

Product scoping, detailed specs, signed scope, low-fi mockups

02

Week 2 · Foundations

Infra, auth, CI/CD, design system, live environments

03

Weeks 3-4 · Core build

Main user flow in TDD, 60% of screens delivered and tested in staging

04

Week 5 · Remaining build

Back-office, edge cases, polish, a11y and security review

05

Week 6 · Launch

Production deployment, monitoring, 1h training, documentation

Included by default: 6 months hosting, monitoring, 2 major post-launch revisions, 1 handover training.

Who I am

10 years of craft, a method that works.

Senior developer based in Bordeaux, I've been building web products since 2015. I learned the trade in demanding French B2B SaaS: Henrri (invoicing for craftsmen), Sellsy (French CRM/ERP), CircularPlace (B2B circular economy marketplace), and on mission at PALO IT (craft, strict TDD).

These years taught me what makes a product last: tested code, clear architecture, rigor that doesn't cave under delivery pressure. The exact opposite of a rushed MVP that has to be thrown away six months later.

The 6-week protocol is the synthesis of those 10 years: productising a method I master to deliver fast, well, with no surprises. Fixed price, signed scope, delivered tested and transferred. It's what I'd want as a founder looking for a developer.

Ready to launch your MVP?

Free 45-minute scoping call. We validate feasibility, estimate scope, and you leave with a clear vision.

See pricing